01
The wall-space test
Opening plus one pocket
One side must store the full slab and frame. The assembly is commonly around twice the opening width, but the selected kit chart controls.
Opening plus two opposite pockets
Each slab retreats into a different wall. Check usable length, structure, and utilities on both sides.
Stop at corners, intersecting walls, cabinets, columns, windows, or other full-depth conflicts.
Locate plumbing, wiring, ducts, blocking, bracing, and structural posts.
Cabinets, handrails, shelves, and televisions may require fasteners that cannot enter the cavity.
02
Rough opening: use the exact frame chart
The rough opening includes the passage and pocket-frame zone, plus vertical allowance for the track, hangers, slab, final floor, and adjustment. Generic formulas are planning estimates only.
| Dimension | Controls | Can change with |
|---|---|---|
| Overall width | Opening, pocket, jambs, stops, and frame ends. | Configuration, slab, frame model, overlap, and trim. |
| Rough height | Track, hanger adjustment, slab, floor gap, and head jamb. | Door height, track series, flooring, and motion hardware. |
| Pocket width | Retraction and pull access. | Slab, edge pull, stops, soft-open, and service space. |
| Jamb depth | Finished wall and trim alignment. | Framing depth, drywall, tile, panels, or furring. |
Select the exact frame first, then use its current dimensional drawing and installation instructions.
03
Wall depth and pocket construction
Common and compatible with many kits, but the narrow cavity gives less tolerance for bow, thick faces, projecting hardware, and long fasteners.
Provide more depth for heavy or thick doors. Use a frame designed for that wall instead of improvised spacers.
Need compatible attachment, reinforcement, and track support; wood-frame fastener schedules may not apply.
Stiffer uprights can help limit pocket-wall movement when matched to the system. View heavy-duty wall uprights ↗
04
Header and structural requirements
Still requires straight, securely anchored framing that supports track and finish without sagging.
A qualified professional must size the structural header and supports. The pocket frame is not a header.
Wider spans magnify deflection, changing track level and center alignment.
Do not remove required bracing to create a pocket without an approved structural solution.
Show the structural header, pocket-frame head, and track separately; each has a different job.
05
Keep utilities out of the pocket
Boxes, cable staples, and long screws can enter the slab path. Relocate them or use an approved strategy outside the cavity.
Supply, waste, vent, and valves need another wall or chase, with future service access.
Ducts, boots, dampers, and lines consume cavity space and may add vibration or condensation.
Install only where the frame permits it; cabinet and rail fasteners cannot cross the pocket.
Mark the pocket before finishing. Use only manufacturer-approved fastener types and lengths so screws cannot scratch or stop the door.
06
Keep the pocket straight, plumb, and parallel
- Level the baseCorrect floor variation or include it in track height and bottom clearance.
- Plumb the jambsCheck both faces and diagonals so adjustment remains possible.
- Level the trackA sloped track makes the door drift open or closed.
- Align split studsKeep pocket faces parallel and properly spaced for the slab and finishes.
- Brace during finishDrywall and trim can pull light framing out of line; recheck before closure.
Before drywall, hang the completed-weight door or suitable test panel and check full travel, rubbing, drift, noise, and pull access.
07
New construction vs. remodeling
New construction
- Lay out from the selected kit
- Route utilities before closure
- Coordinate the header early
- Protect the pocket during finishing
Existing conversion
- Verify wall contents before demolition
- Determine load and bracing conditions
- Plan floor, casing, baseboard, and paint repair
- Expect utility relocation
A true pocket frame normally requires removing drywall from at least one face. A surface-mounted sliding door is a different system.
08
Recommended framing sequence
09
Before the wall is closed
Ready to plan the opening?
Select the frame before final framing.
Use the specific system drawing—not a generic formula—as the project dimension.